Mobius-logo-200x157

Case Study: Atlas Heavy – Fiber Connectivity Project

Dedicated networking solutions fortify Atlas Heavy’s commitment to their customers.

Atlas Heavy is a Houston-based transport company focused on moving large or unique cargo across the U.S.

Atlas used wireless bridges to connect its immense facilities, but their speeds were inadequate and connectivity was unreliable.

Möbius Partners installed a dedicated fiber circuit from the main MDF to the shop facility. A fiber transceiver was installed to convert the fiber to ethernet, and a new Mobius-managed Forti-switch as installed to provide POE and connectivity for phones, wireless access points, and workstations.

Atlas Heavy was finally able to utilize the network reliability and performance they needed to use workstations, VoIP, cameras, and other technology throughout their facility.

We’re grateful for projects where we can be vital partners at critical moments in a company’s growth.
Archives

Subscribe for Email Updates

Speak with an
IT Professional Today!

Please fill out this form and we'll get right back to you.

"*" indicates required fields

Name*
This field is for validation purposes and should be left unchanged.